建设工程设计合同范本(精选16篇) 合同编号:_________本合同由下列双方于_________省_________市签署:甲方:_________公司乙方:_________公司甲乙双方因_________工程总体规划文件事宜,经协商一致,达成本合同,共同遵守执行。....

  1.2 Laws and regulations of the related state and local construction survey and design management.

  1.3建设工程批准文件。1.3 Documents of Approval for Construction.

  第二条 设计依据Article 2 Design Basis

  2.1发包人给设计人的委托书或设计中标文件

  2.1 The Trust Deed or Design Documents of the tender accepted provided to the designer by the employer;

  2.2发包人提交的基础资料2.2 Fundamental materials submitted by the employer;

  2.3设计人采用的主要技术标准是:2.3 The major technical standards adopted by the designer are:

  B-01R5-SJ-02-20xx标准、规程、规范

  B-01R5-SJ-02-20xx Standards, Procedures, Norms

  第三条 合同文件的优先次序Article 3 Priority of Contract Document

  构成本合同的文件可视为是能互相说明的,如果合同文件存在歧义或不一致,则根据如下优先次序来判断:

  The documents consisting of this Contract may be deemed as demonstrating mutually; if there is any ambiguity or discordance in the contract document, the following priority shall be followed to judgment,

  3.1合同书 3.1 The Contract;

  3.2中标函(文件) 3.2 Letter of Acceptance (Document);

  3.3发包人要求及委托书 3.3 Requirements of the employer and Letter of Authority;

  3.4投标书 3.4 The Tender

  第四条 本合同项目的名称、规模、阶段、投资及设计内容(根据行业特点填写)

  Article 4 Name, Scale, Phase, Investment and design Content for the Contract Items (fill in based on industry characteristics)

  10KV星摩尔购物广场1#变电所新建工程

  10KV Star Mall Plaza 1 # Substation New Construction

  变电所电气及10KV进线

  Electric and 10KV inlet wire of the substation

  变电所设在地下,内设6台1600KVA变压器及2台1250KVA变压器。

  The substation is underground, with six 1,600KVA transformers and two 1,250KVA transformers inside.

  10KV电源分别由劝工变、历工变电所各新出电缆新路径电缆敷设至用户

  变电所。

  The 10KV power line is laid along the new cable roads of Quangong Substation and Ligong Substation respectively, toward the customer substation with cables.

  第五条 发包人向设计人提交的有关资料、文件及时间

  Article 5 Relevant materials, documents and time submitted to the designer

  本工程供电方案 1份 20xx-2-25

  Power supply scheme of this project 1 25 February, 20xx

  用电负荷资料 1份 20xx-2-25

  by the employer

  Electricity load data 1 25 February, 20xx

  第六条 设计人向发包人交付的设计文件、份数、地点及时间

  Article 6 Documents, number of copies, location and time submitted to the employer by the designer

  设计图纸 8份 20xx-04-15

  Design drawing 8 copies 15 April, 20xx

  概算书 6份 20xx-04-15

  Book of estimates 6 copies 15 April, 20xx

  注:待发包人结清全部设计费后,由设计人将设计文件交付沈阳供电公司客户工程部

  Note: After the party issuing contract settles up the total design fee, the above design documents will be submitted to the Project Division of Shenyang Power Supply Company by the designer.

  第七条  费用Article 7 Expenditure

  7.1双方商定,本合同的设计费为设计费按设计价格(20xx)10号文计取 万元。收费依据和计算方法按国家和地方有关规定执行,国家和地方没有规定的,由双方商定。

  7.1 It is agreed between both parties that the design fee under this contract is calculated and charged according to the document No.10 (20xx) Design Prices. The charging basis and method are in accordance with relevant national and local provisions, and will be determined by both parties through negotiation, if there is no relevant national or local provision.

  7.2 如果上述费用为估算设计费,则双方在初步设计审批后,按批准的初步设计概算核算设计费。工程建设期间如遇概算调整,则设计费也应做相应调整。

  7.2 If the above expense is estimated design fee, both parties shall check the design fee as per the approved budgetary estimate of the preliminary design, after the examination and approval of preliminary design. During the construction of this project, if there is any adjustment in budgetary estimate, the design fee will also be adjusted correspondingly.

  第八条  支付方式Article 8 Form of Payment

  8.1本合同生效后三天内,发包人支付设计费总额,计 16 万元作为定金(合同结算时,定金抵作设计费)。

  8.1 The party issuing contract shall pay the total design fee, within three days after the execution of this contract, that is, 160000 RMB as a deposit (the deposit will be seen as a part of design fee, at the time of contract settlement).

  8.2设计人提交  全部  设计文件之前,发包人结清设计费,不留尾款。

  8.2 Before the designer submits all design documents. the design charge is all squared by the employer, and no final payment left.

  8.3双方委托银行代付代收有关费用。

  8.3 Both parties commission bank to pay and collect related fees.

  第九条  双方责任Article 9 Responsibility of Two Parties

  9.1 发包人责任9.1 Responsibility of the Employer

  9.1.1发包人按本合同第五条规定的内容,在规定的时间内向设计人提交基础资料及文件,并对其完整性、正确性及时限负责。发包人不得要求设计人违反国家有关标准进行设计。

  发包人提交上述资料及文件超过规定期限15天以内,设计人按本合同第六条规定的交付设计文件时间顺延;发包人交付上述资料及文件超过规定期限15天以上时,设计人有权重新确定提交设计文件的时间。

  9.1.1 The Employer shall deliver basic materials and documents to the designer within the specified time in accordance requirements stipulated in Article 5, and shall be responsible for their completeness, correctness and time limit. The employer shall not request the designer to design by violating the concerned national standards.

  If it exceeds the prescribed time limit within fifteen (15) days when the employer delivers above materials and documents, the designer can postpone accordingly the time of delivering the design documents in accordance with Article 6 in the Contract; if it exceeds the prescribed time limit over fifteen (15) days when the employer delivers above materials and documents, the designer is entitled to decide again the time of delivery of design documents.

  9.1.2发包人变更委托设计项目、规模、条件或因提交的资料错误,或所提交资料作较大修改,以致造成设计人设计返工时,双方除另行协商签订补充协议(或另订合同)、重新明确有关条款外,发包人应按设计人所耗工作量向设计人支付返工费。

  9.1.2 When the employer alters entrusted design items, scale and conditions, or delivers the wrong materials, or delivers mostly revised materials so that the designer rework for the design, the employer shall pay for rework cost for the designer based on the amount of the work performed by the designer except the supplemental agreement (or contract ) signed separately, and the relevant articles specified again by both parties through the consultation.

  Prior to signing the contract, if the employer has satisfied to design work which is done by the designer, the employer shall pay the corresponding design charge.

  在未签订合同前发包人已同意,设计人为发包人所做的各项设计工作,发包人应支付相应设计费。

  9.1.3在合同履行期间,发包人要求终止或解除合同,设计人未开始设计工作的,不退还发包人已付的定金;已开始设计工作的,发包人应根据设计人已进行的实际工作量,不足一半时,按该阶段设计费的一半支付;超过一半时,按该阶段设计费的全部支付。

  9.1.3 During implementation of the Contract, when the employer requests to terminate and cancel the contract, the down payment paid by the employer shall not be returned if the designer doesn’t begin the design work; if the designer starts the design, the employer shall pay half of design charge in the phase if it is less than half of the actual amount of work performed by the designer; if it exceeds the half, the full design charge in the phase shall be paid in all.

  9.1.4发包人必须按合同规定支付定金,收到定金作为设计人设计开工的标志。未收到定金,设计人有权推迟设计工作的开工时间,且交付文件的时间顺延。

  9.1.4 The employer shall pay the down payment in accordance with stipulations of the Contract. Reception of the down payment is the mark of commencement of design work for the designer. If the down payment is not received, the designer is entitled to put off the time of commencement of design work, and postpone accordingly the time of delivery of documents.

  9.1.5发包人应按本合同规定的金额和日期向设计人支付设计费,每逾期支付一天,应承担应支付金额千分之二的逾期违约金,且设计人提交设计文件的时间顺延。逾期超过30天以上时,设计人有权暂停履行下阶段工作,并书面通知发包人.发包人的上级或设计审批部门对设计文件不审批或本合同项目停缓建,发包人均应支付应付的设计费。